Rebuild of an existing furnace 190Ton/day, cross fired, and the production lines with 3 IS-machines (3 x 8 sections), lehrs, cold-end, packing
Study and construction of a new furnace 180 Ton/day, end fired, and 3 production lines with IS-machines, lehrs, cold-end, packing
Study and rebuild of a furnace 120Ton/day, end fired, including the production lines with 2 IS-machines (6 and 10 sections), lehrs, cold-end, packing. The furnace was a new design made by the GPM-team. New furnace and hot-end building.
Partial turn-key job. New installation in existing plant of a furnace 150Ton/day, end fired, and the production lines with 2 IS-machines (2 x 8 sections), lehrs, cold-end, packing. New furnace and hot-end building.
Basic design and rebuild of a furnace 300Ton/day, end fired, and the production lines with 4 IS-machines (6, 8, 10 and 12 sections), lehrs, cold-end, packing. New glass recuperation system for cold and hot glass.
Study of a complete new modern glass plant on a green field, with 2 end fired furnaces 400Ton/day.
New factory with construction of a new furnace 320Ton/day, end fired, and the production lines with 3 IS-machines (3 x 12 sections), lehrs, cold-end, packing and shrinking. New buildings for the complete production lines, including offices, workshops, warehouses and social building.
Study and construction of a full-automatic recycling plant for bottles and jars, 35Ton/hour.
Rebuild of a furnace 230Ton/day, cross fired, and the production lines with 4 IS-machines (6 and 3 x 10 sections), lehrs, cold-end, packing. New batch house with recuperation of existing storage silos.
Study and rebuild of a furnace 180Ton/day, end fired, and the production lines with 4 IS-machines, lehrs, cold-end, packing.
Basic design of a new furnace 300Ton/day with oxy-burners.
Restructuration of an existing glass plant, under receivership. Management by objectives. Optimization of labor forces, organization and communication. Business plan and preparation for a new restart after bankruptcy.
Study and rebuild of a furnace 300Ton/day. Very low budget and very short time schedule.
Consultancy job for a furnace rebuild
Basic engineering for the production layout and the buildings for a new glass plant. Detailed engineering for the pipe-work, electricity supply and distribution, and the utilities.
Construction drawings and stability calculations for a batch silo in an existing building.
3D-design of big perfume bottle (Guerlain - Shalimar).
3D-design of special shape beer glass for a brewery.
Construction and layout drawings and stability calculations for a new batch house for container glass.
Construction and layout drawings for a new batch house for container glass.
Study, construction and start-up for a glass recycling plant for float glass (10Ton/hour).
3D design of new glasses for a catalog
3D model of a glass furnace for a catalog
basic layout for feasibility study
new layout for production and batch house extension
supply, erection and start-up of a new glass plant (500 Kg/day) with used and overhauled equipment
complete furnace audit and proposals for repairs
Consulting for the erection of a new plant for bottle production
Audit and advises in a tableware plant for a furnace rebuild
Feasibility study for the erection of a new glass plant
Extension of an existing glass recycling plant
Complete project management of a 240 tpd furnace rebuild, including field supervision (6 weeks from glass to glass)
Layout for a complete new glass decoration plant (serigraphy of tableware)
Again… extension of a glass recycling plant (for flat glass recycling)
Complete feasability study including:
general layout showing all needed equipment from batch house to packing
optimization of flows (production, goods and people)
proposals for new buildings and new auxiliary equipment
Complete engineering, project management and site supervision in an existing glass plant (from a worldwide known group) with replacement of complete production lines, including:
general layout drawings hot end and cold end
detail engineering for IS machines support and platforms at all levels
engineering for an overhead crane to install above IS machines in production
cooling duct design for 8, 10 and 16 section machines
hot cullet collecting with automatic emergency systems and direct recycling
basement reorganization (improvement of circulation and safety)
heavy safety procedures
Basic engineering for the production layout and the buildings for a new tableware glass plant. Detailed engineering for the pipe-work and the utilities
Complete engineering for the extension of an existing glass plant (bottle production) – from batch house to packing…
maybe your project!!!